Case Study – Stainless Steel Ducting – Curtin University

CURTIN UNIVERSITY, BENTLEY CAMPUS PERTH

STAINLESS STEEL DUCTING

CLIENT: ENVAR PTY LTD

YEAR: 2016

SECTOR: COMMERCIAL

NEW TECHNOLOGY   

Building 304 will provide custom research facilities dedicated to the Centre for Crop and Disease. Situated on the eastern side of Curtin’s Bentley campus; the four-story building will feature three levels of highly specialised laboratories.

SCOPE OF WORKS

Austline Fabrications was awarded the contract to supply, fabricate and install all associated stainless steel ductwork and decontamination lines for the custom research facilities by lead contractor Envar Group. Austline successfully designed, fabricated and installed all deliverables. Austline also assisted with final testing before the handover to the client.

PRE-WORKS & COMPETITIVE SOLUTIONS  

A comprehensive pre site measure to existing floor and ceiling penetrations allowed Austline to customise and pre fabricate with precision in our Perth based factory. The pre-fabricated lobster back elbows, t- junctions and all spooling were then installed on site by experienced tradesmen with specialised cushion head install engaging purge welding techniques. Working with Envar on the design of the cushion head allowed for cost effective fabrication. Austline’s opportunity to maximise off site fabrication of large bore spools was integral in the success of the projects timeline.

QUALITY – SANITARY GRADE  

This facility demanded each environment within the building to have a specific controlled atmosphere. The ductwork required Austline fabricators and installers to utilise sanitary grade purge welding to all stainless steel spools and fabricated items to ensure air purification of individual rooms and spaces in the laboratory. Passivation of all welds also ensured successful final testing of the system. This dedicated research building provides truly world-class contemporary facilities and will be the catalyst in attracting globally recognised crop and disease management scholars to Curtin University.

crown towers stainless steel

Case Study – Architectural Stainless Steel – Crown Towers

CROWN TOWERS, WESTERN AUSTRALIA

ARCHITECTURAL STAINLESS STEEL FEATURES

CLIENT: BROOKFIELD MULTIPLEX

YEAR: 2016

SECTOR: COMMERCIAL

WORLD CLASS ESTABLISHMENT  

Austline Fabrications were awarded the specialised architectural and intricate stainless steel fabrication and installation of Perth’s newest and most luxurious hotel, overlooking the Swan River. Setting a new standard in Western Australia, Crown Towers feature 500 guest rooms, suites and villas, restaurants, bars, a ballroom, business centre, resort pool and world class spa facilities.

SPECIALISED FABRICATION

Austline fabricated in our custom-built workshop visually outstanding stainless steel porthole windows, flashings, balustrading, TV surrounds and stainless features. These components are purposefully showcased throughout the custom designed interiors and exteriors of the hotel.

THE PORTHOLE

To fabricate the high-end window dressings, Austline imported the exotic champagne/rose gold stainless steel. Situated adjacent to The Waiting Room Bar, both windows were custom fit to reflect the opulence of the Crown Towers through there seamless and intricate appearance and purpose.

HIGH QUALITY OUTCOME

After completing extensive site measurements and liaising with our client, Austline installed all fabricated components on site. The visually impressive and architecturally inspired result showcases the outstanding fabrication and installation of stainless steel and its versatility within the commercial sector.

cookers bulk oil

Case Study – Relocation & Expansion – Cookers Bulk Oil

COOKERS BULK OIL SYSTEMS, WESTERN AUSTRALIA

RELOCATION & EXPANSION

CLIENT: COOKERS BULK OIL SYSTEMS

YEAR: 2016

SECTOR: FOOD & BEVERAGE

PROJECT SCOPE  

Austline Fabrications is pleased to have assisted Cookers Bulk Oil Systems in their commitment to innovation in providing their clients with fresh oil solutions and sustainable management of bulk oils. Austline collaborated with Cookers for a three month project to install and upgrade the capacity of the tanks for bulk oils handling in their Perth plant.

EXPERIENCE & EXPERTISE

Our specialised process pipe tradesman fitted and installed four new tanks to increase the capacity to six fresh oil tanks while also doubling the capacity of an existing waste oil tank. Austline installed the tanks and associated pipework to increase the filtration from a stage one filter to a three stage micro filtration process. In addition, at Cookers new facility the capacity increased from 90,000 litres to 300,000 litres. Austline were integral in doubling the waste oil capabilities from 30,000 litres to 60,000 litres.

INNOVATION

Austline designed, fabricated and installed two valve manifold systems, allowing efficient transfer of product between tanks to the trucks for the loading and unloading process. In addition to this specialised fabrication Austline sourced, fabricated and installed with precision the two swivel truck systems which increases operational efficiency in the transfer of oils.

Fabrication allowances were made for future expansion of two new fresh oil tanks through the manifold system at the facility.

beenyup smp installation

Case Study – SMP Installation – Beenyup Water Treatment Plant

BEENYUP WATER TREATMENT FACILITY, WESTERN AUSTRALIA

BORE SMP INSTALLATION

CLIENT: KEP RECHARGE ALLIANCE

YEAR: 2016

SECTOR: WATER

PROJECT SCOPE  

KEP Recharge Alliance, a joint venture between Thiess and CH2M Hill Australia has started construction works on a $125 million capabilities/water recycling plant in the northern Perth suburb of Craigie. KEP Recharge Alliance is responsible for the design, construction and commissioning of the Advanced Water Recycling Plant. The partnership between CHT JV and Water Corporation will have a capacity to recharge 14 billion litres of capabilities/water into groundcapabilities/water supplies; the scheme will provide a new climate independent capabilities/water source to boost much needed drinking capabilities/water supplies. In the future, the scheme can be expanded to ultimately deliver 28 billion litres of capabilities/water when needed.

WATER RECHARGE

Once complete, the scheme will recycle capabilities/water, treat it to drinking capabilities/water standards and recharge it back into existing groundcapabilities/water supplies. The Alliance will move more than 18,000 cubic metres of earth before constructing the plant and will then pour 1000cu.m of concrete, install 70km of cables and lay 15km of pipes.

The project is scheduled for completion in late 2016 and will have built-in capacity to expand production to 28 billion litres of capabilities/water as demand increases.

AUSTLINE FABRICATIONS INSTALLATION

Austline Fabrications has been awarded the installation of all pipe supports, piping, valves and associated instruments to all recharge spooling. Austline committed to a schedule and timeline of mobilisation of bore piping; documentation verification, onsite fabrication and Hydro testing all spooling to AS4041 & AS4037.

Austline approached the installation methodically with successful finalisation of all documentation.

 

civmec

Civmec

Austline is pleased to announce Civmec have awarded the Port Kembla Coal Terminal refurbishments works to the TFG Group. Our Welshpool factory has started production and fabrication of the reclaimed buckets in 3CR12.