Go behind the scenes with Little Creatures, this time at their much loved Geelong brewery in Victoria. See how Lion and their team took an old mill and made it their home on the east coast. TFG Group was proud to be the lead mechanical installation company at the Little Creatures Brewery.
From an old crocodile farm to becoming one of Australia’s most respected craft beers – see where it all started for Little Creatures 16 years ago. TFG Group are proud to be a part of the iconic Little Creatures and Lion journey across Australia, as the mechanical installation company for the breweries in Fremantle, Western Australia and Geelong, Victoria.
Check out our case studies on both successful projects below:
As part of South Australia’s West End Brewery redevelopment, Austline Fabrications was engaged to fabricate a stainless steel tank canopy for a capabilities/water treatment tank at the Thebarton site.
Austline arranged for design and certification of the canopy to ensure it’s safety and ease of installation. The 14 metre diameter canopy was manufactured in Perth in triangular quadrants so that it could be disassembled for ease of delivery. The Austline installation team delivered and installed the canopy on site.
CARBON FILTRATION
During the installation of the canopy, the client also requested that we assist with designing and installing an odour elimination system to the tank’s pipe work. This was predominantly due to some complaints received in the local area.
Austline were happy to oblige, designing an activated carbon filtration system through a 300mm extraction pipe that succeeded in eliminating 97% of odours.
SERVICES OFFERED
Austline is committed to offering a value added service which was highlighted by this project with a specially designed stainless steel fabrication combined with a carbon filtration system.
In 2013, Lion Nathan resolved to close the Canning Vale operations of the iconic Swan Brewery and move production interstate. The Swan and Emu beer brands and keg production would be transferred to the company’s West End Brewery in South Australia. Austline Fabrications was engaged by Lion Nathan to complete the following scope of works;
Remove 4 fermenting vessels used for beer production in Canning Vale
Refurbish and modify the vessels to suit cider fermentation with modifications made to the cones, nozzles and jackets
Load and transport the vessels to South Australia
Install the tanks at West End Brewery in AdelaideLOGISTICS
The sheer size of the vessels required extensive logistics planning for the removal, refurbishment and transportation to the new site.
Each vessel was;
– 150 thousand hectolitres
– 18 metres tall x 4.2m diameter
– 20 tonnes
INSTALLATION
Austline, as part of TFG Group have extensive experience in food & beverage installation projects and were able to deliver and install the refurbished tanks at the new West End site in Adelaide.