• metal fabrication projects
    Austline Fabrications

    Projects

Austline Fabrications has the privilege of working with a wide range of clients in the agricultural, commercial, food and beverage, resources and water industries, providing mild and stainless steel, aluminium and exotic alloy fabrication services to the highest standards.

If you are interested in learning more about our past projects, view our case studies below. You can view all case studies, or filter our industries according to your interests – Agriculture, Commercial, Food and Beverage, Resources and Water.

Clough Suez Water Partners

CLOUGH SUEZ WATER PARTNERS

Beenyup Advanced Water Recycling Plant Stage 2, Perth

TFG Group supplied large N6 Pipe Spools for Beenyup AWRP Stage 2. The Clough SUEZ Water Partners joint venture was awarded a contract to complete the Stage 2 expansion at the AWRP Stage 2 in Craigie, Western Australia.

Download our Case Study PDF below to read more about this project.

Beenyup Sulphuric Acid Tanks, Perth

CLOUGH SUEZ

Beenyup Sulphuric Acid Tanks, Perth

TFG Group were awarded the fabrication of an 10,000 litre Sulphuric Acid Storage Tank to design and code API 650.

Download our Case Study PDF below to read more about this project.

Cleveland Bay Header Spools, Brisbane

EVOQUA WATER TECHNOLOGIES

Cleveland Bay Header Spools, Brisbane

TFG Group was awarded the fabrication of 32 Header Spools to the Queensland Water Authority Standard and Specification, successfully delivering the project fabrication on time, safely and within specifications.

Download our Case Study PDF below to read more about this project.

Specialised Pipe Racks, Beresfield

FUCHS LUBRICANTS

Specialised Pipe Racks, Beresfield

TFG Group proudly completed the Greenfield mechanical installation expansion for Fuchs Lubricants in Beresfield, New South Wales. The 12-month installation project included nine kilometres of 304 stainless steel sanitary grade tube, one kilometre of stainless steel pipe, multiple tanks and the specialised fabrication of a blending platform and pipe racks to move specialised oils around the 25,000 metered squared factory.

Download our Case Study PDF below to read more about this project.

RC3 Reclaimer Buckets, Port Kembla Coal Terminal

CIVMEC

RC3 Reclaimer Buckets, Port Kembla Coal Terminal

TFG Group were awarded the fabrication of 15 reclaimer buckets for the Port Kembla Coal Terminal in Wollongong, New South Wales. The design and fabrication required TFG to design an initial ‘jig’ to ensure consistency of build tolerance across all buckets. The tight timeframe of delivery required the universal fit as critical in the fabrication process. Throughout the fabrication process extensive MDR and ITP requirements were supplied to ensure all quality assurances and specifications were achieved.

Download our Case Study PDF below to read more about this project.

Hopper Liner Insert Project, Tropicana Gold Mine

DAVIES WEAR PLATE SYSTEMS

Hopper Liner Insert Project, Tropicana Gold Mine

TFG Group was awarded the fabrication of two Hopper Liners by Davies Wear Plate Systems for the end client Tropicana Gold Mine. TFG successfully fabricated the liners to protect their existing assembly.

Download our Case Study PDF below to read more about this project.

Relocation and Expansion Project, Perth

COOKERS BULK OIL SYSTEMS

Relocation and Expansion Project, Perth

TFG Group is pleased to have assisted Cookers Bulk Oil Systems in their commitment to innovation in providing their clients with fresh oil solutions and sustainable management of bulk oils. TFG collaborated with Cookers for a three month project to install and upgrade the capacity of the tanks for bulk oils handling in their Perth plant.

Download our Case Study PDF below to read more about this project.

Milk Processing Skids, Wetherill Park

PROCESS PARTNERS

Milk Processing Skids, Wetherill Park

TFG Group was engaged to supply, manufacture and install three mounted and fully assembled pasteuriser skids as part of the Lion flavoured milk upgrade in New South Wales. In addition, TFG was awarded the fabrication of a thermaliser skid, two CIP skids and preheaters of which all were fabricated, delivered and installed to the Lion owned Wetherill Park facility.

Download our Case Study PDF below to read more about this project.

Clean In Place System, Meadowlea Factory

GRAINCORP

Clean In Place System, Meadowlea Factory

In 2015, Graincorp awarded TFG Group a contract to fabricate a Clean in Place (CIP) system for the Meadowlea factory in Melbourne. A CIP system allows factories to clean the interior surfaces of pipes, vessels, process equipment, filters and associated fittings, without disassembly.

Download our Case Study PDF below to read more about this project.

Beenyup Recharge Bore SMP Installation, Perth

KEP RECHARGE ALLIANCE

Beenyup Recharge Bore SMP Installation, Perth

TFG Group has been awarded the installation of all pipe supports, piping, valves and associated instruments to all recharge spooling. TFG committed to a schedule and timeline of mobilisation of bore piping; documentation verification, onsite fabrication and Hydro testing all spooling to AS4041 &AS4037.

Download our Case Study PDF below to read more about this project.

Architectural Stainless Steel Features, Crown Towers Perth

BROOKFIELD MULTIPLEX

Architectural Stainless Steel Features, Crown Towers Perth

TFG Group were awarded the specialised architectural and intricate stainless steel fabrication and installation of Perth’s newest and most luxurious hotel, overlooking the Swan River. Setting a new standard in Western Australia, Crown Towers feature 500 guest rooms, suites and villas, restaurants, bars, a ballroom, business centre, resort pool and world class spa facilities.

Download our Case Study PDF below to read more about this project.

Curtin University, Bentley Campus Perth

ENVAR

Curtin University, Bentley Campus Perth

TFG Group was awarded the contract to supply, fabricate and install all associated stainless steel ductwork and decontamination lines for the custom research facilities by lead contractor Envar Group. TFG successfully designed, fabricated and installed all deliverables. TFG also assisted with final testing before the handover to the client.

Download our Case Study PDF below to read more about this project.

Spray Tank Extensions, Kukerin

YARRAMUNDI

Spray Tank Extensions, Kukerin

TFG Group was engaged by Yarramundi Farms to modify an existing stainless steel chemical tank on a purpose built John Deere self-propelled boom spray. The addition of this modified tank to the machinery extended the capacity to 6000 litres and was fabricated and installed within a 7-day timeline.

Download our Case Study PDF below to read more about this project.

Tank Canopy and Filtration System, West End Brewery

SA BREWING

Tank Canopy and Filtration System, West End Brewery

As part of South Australia’s West End Brewery redevelopment, TFG Group was engaged to fabricate a stainless steel tank canopy for a water treatment tank at the Thebarton site.

Download our Case Study PDF below to read more about this project.

Tank Refurbishment, Swan Brewery and West End Brewery

LION NATHAN

Tank Refurbishment, Swan Brewery and West End Brewery

TFG Group was engaged by Lion Nathan to complete the following scope of works; remove four fermenting vessels used for beer production in Canning Vale, refurbish and modify the vessels to suit cider fermentation with modifications made to the cones, nozzles and jackets, load and transport the vessels to South Australia and install the tanks at West End Brewery in Adelaide.

Download our Case Study PDF below to read more about this project.

Acetic Acid Tanks, Boddington Gold Mine

ORICA

Acetic Acid Tanks, Boddington Gold Mine

Orica engaged TFG Group to fabricate a range of tanks and pipe spooling for their mining services project at Boddington Gold Mine in Western Australia.

Download our Case Study PDF below to read more about this project.

Conveyor Transfer System, North Capel Mineral Separation Plant

ILUKA

Conveyor Transfer System, North Capel Mineral Separation Plant

In 2012, TFG Group was engaged by Iluka Mineral Sands to assist with the refurbishment of their conveyor transfer system at the North Capel Mineral Separation Plant in Western Australia. The conveyor is designed to transfer 1000 tonnes of mineral sands per day through a synthetic rutile kiln at temperatures reaching 800 degrees Celsius. The high temperature causes systematic wear of the conveyor which required refurbishment by the TFG fabrication team.

Download our Case Study PDF below to read more about this project.

Water Treatment Skid, Santos Waddy Brae Minesite

VEOLIA

Water Treatment Skid, Santos Waddy Brae Minesite

In a world first, TFG Group were given the opportunity to fabricate a water treatment module which combined micro-filtration and reverse osmosis carbon filtration systems on the same transportable skid.

Download our Case Study PDF below to read more about this project.

Reverse Osmosis Skid, Woodside North Rankin Platform

VEOLIA

Reverse Osmosis Skid, Woodside North Rankin Platform

TFG Group was awarded the contract by Veolia Water to fabricate a two-pass Brackish Water Reverse Osmosis (BWRO) Plant for the new North Rankin B platform, installed 100 metres from the existing North Rankin A platform. The BWRO was designed by Veolia to produce demin water with very low chloride levels for topping up of the platform tempered water system.

Download our Case Study PDF below to read more about this project.

Portable Blast Rooms, Western Australia

KAEFER

Portable Blast Rooms, Western Australia

In 2010, Kaefer awarded TFG Group a contract to fabricate six portable blast rooms for use in their resources projects throughout Western Australia. Each blast room was manufactured to include ventilation and air conditioning with the blasting room fully ventilated and insulated from the external environment.

Download our Case Study PDF below to read more about this project.

Chemical Treatment Plant Upgrade, Hyperchlorite Plant

LYCOPODIUM

Chemical Treatment Plant Upgrade, Hyperchlorite Plant

In 2008, TFG Group fabricated, installed and commissioned an upgrade to Orica’s Hypochlorite Plant in Kewdale, Western Australia. When TFG was engaged, the project was running eight weeks behind schedule. TFG was offered an incentive if all components were manufactured, installed and commissioned within a tight 12 week timeframe. All components were delivered on time.

Download our Case Study PDF below to read more about this project.

Buffer Tank, Shenton Park Waste Water Facility

RCR TOMLINSON

Buffer Tank, Shenton Park Waste Water Facility

TFG Group was awarded the design, engineering, fabrication and testing of the Buffer Tank to be installed for the purpose of Waster water treatment at Shenton Park in Western Australia.

Download our Case Study PDF below to read more about this project.

Stainless Steel Solutions for Water Corporation Projects

WATER CORPORATION

Stainless Steel Solutions for Water Corporation Projects

TFG Group have fabricated and supplied pit covers, safety grates, stainless steel cast in frames, aluminum pit covers, inlets specials and multiple pipe spooling. 

Download our Case Study PDF below to read more about this project.

ENGINEERED PROCESS SYSTEMS

Elution Skids, Gold Mines

Consultancy Engineers EPS awarded TFG Group contracts to supply and fabricate several skid mounted Elution Circuit Heating packages. These skids were manufactured to be installed at a number of National and International Gold Mines.

Download our Case Study PDF below to read more about this project.