Austline Fabrications has the privilege of working with a wide range of clients in the resources, capabilities/water, food & beverage and commercial industries, providing mild and stainless steel, aluminium and exotic alloy fabrication services to the highest standards.

If you are interested in learning more about our past projects, view our case studies below. You can view all case studies, or filter our sectors according to your interests - Food & Beverage, Resources, and Water.

Clough Suez

Beenyup Sulphuric Acid Tanks

Tank Fabrication

 TFG Austline were awarded the fabrication of supply of an 10,000 litre Sulphuric Acid Storage Tank to design and code API 650.

Download our Case Study PDF below to read more about this project.

Graincorp

Clean In Place System, Meadowlea Factory

Clean In Place System

In 2015, Graincorp awarded Austline Fabrications a contract to fabricate a Clean in Place (CIP) system for the Meadowlea factory in Melbourne. A CIP system allows factories to clean the interior surfaces of pipes, vessels, process equipment, filters and associated fittings, without disassembly.

Industries that require CIP systems are usually those that require a high level of hygiene such as the food and beverage industry.

This Clean in Place system is designed for a three-stage caustic, acid and capabilities/water rinsing cycle and includes jacketed pipe work to ensure the internal temperature stays at 80 degrees Celsius.

Download our Case Study PDF below to read more about this project.

Civmec

Civmec RC3 Reclaimer Buckets, Port Kembla Coal Terminal

Scope of Works

Austline Fabrications were awarded the fabrication of 15 reclaimer buckets for the Port Kembla Coal Terminal in Wollongong, New South Wales. The design and fabrication required Austline to design an initial ‘jig’ to ensure consistency of build tolerance across all buckets. The tight timeframe of delivery required the universal fit as critical in the fabrication process. Throughout the fabrication process extensive MDR and ITP requirements were supplied to ensure all quality assurances and specifications were achieved.

Download our Case Study PDF below to read more about this project.

Cookers

Relocation and Expansion Project, Cookers Bulk Oil Systems Plant

Project Scope

Austline Fabrications is pleased to have assisted Cookers Bulk Oil Systems in their commitment to innovation in providing their clients with fresh oil solutions and sustainable management of bulk oils. Austline collaborated with Cookers for a three month project to install and upgrade the capacity of the tanks for bulk oils handling in their Perth plant.

Download our Case Study PDF below to read more about this project.

Iluka

Conveyor Transfer System, North Capel Mineral Separation Plant

Conveyor Upgrade

In 2012, Austline Fabrications was engaged by Iluka Mineral Sands to assist with the refurbishment of their conveyor transfer system at the North Capel Mineral Separation Plant in Western Australia. The conveyor is designed to transfer 1000 tones of mineral sands per day through a synthetic rutile kiln at temperatures reaching 800 degrees Celsius. The high temperature causes systematic wear of the conveyor which required refurbishment by the Austline Fabrication team.

Download our Case Study PDF below to read more about this project.

Kaefer

Portable Blast Rooms

Blast Rooms

In 2010, Kaefer awarded Austline Fabrications a contract to fabricate six portable blast rooms for use in their resources projects throughout Western Australia.

Each blast room was manufactured to include ventilation and air conditioning with the blasting room fully ventilated and insulated from the external environment.

Download our Case Study PDF below to read more about this project.

KEP Recharge Alliance

Beenyup Recharge Bore SMP Installation

Project Scope

KEP Recharge Alliance, a joint venture between Thiess and CH2M Hill Australia has started construction works on a $125 million capabilities/water recycling plant in the northern Perth suburb of Craigie. KEP Recharge Alliance is responsible for the design, construction and commissioning of the Advanced Water Recycling Plant. The partnership between CHT JV and Water Corporation will have a capacity to recharge 14 billion litres of capabilities/water into groundcapabilities/water supplies; the scheme will provide a new climate independent capabilities/water source to boost much needed drinking capabilities/water supplies. In the future, the scheme can be expanded to ultimately deliver 28 billion litres of capabilities/water when needed.

Download our Case Study PDF below to read more about this project.

Process Partners

Milk Processing Skids Project Ninja

Scope of Works

Austline Fabrications was engaged to supply, manufacture and install three mounted and fully assembled pasteuriser skids as part of the Lion flavoured milk upgrade in New South Wales. In addition, Austline was awarded the fabrication of a thermaliser skid, two CIP skids and preheaters of which all were fabricated, delivered and installed to the Lion owned Wetherill Park facility.

Download our Case Study PDF below to read more about this project.

Veolia

Reverse Osmosis Skid, Woodside North Rankin Platform

Oil & Gas Precision

Austline Fabrications was awarded the contract by Veolia Water to fabricate a two-pass Brackish Water Reverse Osmosis (BWRO) Plant for the new North Rankin B platform, installed 100 metres from the existing North Rankin A platform. The BWRO was designed by Veolia to produce demin capabilities/water with very low chloride levels for topping up of the platform tempered capabilities/water system.

Download our Case Study PDF below to read more about this project.

Orica

Acetic Acid Tanks, Boddington Gold Mine

Chemical Treatment

Orica is the world’s largest provider of commercial explosives and blasting systems, delivering innovative solutions to the open cut and underground mining, quarry, civil construction, tunnelling and oil and gas markets.

Orica engaged Austline Fabrications to fabricate a range of tanks and pipe spooling for their mining services project at Boddington Gold Mine in Western Australia.

Download our Case Study PDF below to read more about this project.

Orica

Chemical Treatment Plant Upgrade, Hyperchlorite Plant

Delivered on Time

In 2008, Austline Fabrications fabricated, installed and commissioned an upgrade to Orica’s Hypochlorite Plant in Kewdale, Western Australia. When Austline was engaged, the project was running eight weeks behind schedule. Austline was offered an incentive if all components were manufactured, installed and commissioned within a tight 12 week timeframe. All components were delivered on time.

Download our Case Study PDF below to read more about this project.

Veolia

Water Treatment Skid, Santos Waddy Brae Minesite

World First Design

In a world first, Austline Fabrications were given the opportunity to fabricate a capabilities/water treatment module which combined micro-filtration and reverse osmosis carbon filtration systems on the same transportable skid.

The resulting module was capable of converting 30,000L of waste capabilities/water into potable capabilities/water every hour.

Download our Case Study PDF below to read more about this project.

Schenck Process

Components Fabricated

Spring Brackets, Dust Seal Plates, Grip Rods

Download our Case Study PDF below to read more about this project.

Schenck Process

Components Fabricated

Exciter Cages, Exciter Guards, Dynamic Guards

Download our Case Study PDF below to read more about this project.

Schenck Process

Components Fabricated

Deck Rails, Welded Spring Brackets, Huck Bolted Spring Brackets

Download our Case Study PDF below to read more about this project.

Schenck Process

Components Fabricated

Dust Housing Feed End & Discharge End

Download our Case Study PDF below to read more about this project.

Schenck Process

Components Fabricated

Guillotine Gates, Stainless Steel Rotor Blades

Download our Case Study PDF below to read more about this project.

Schenck Process

Components Fabricated

Link Bars, Belt Guards, Drive Shaft Guards

Download our Case Study PDF below to read more about this project.

Lion Nathan

Tank Refurbishment, Swan Brewery & West End Brewery

Scope of Works

In 2013, Lion Nathan resolved to close the Canning Vale operations of the iconic Swan Brewery and move production interstate. The Swan and Emu beer brands and keg production would be transferred to the company’s West End Brewery in South Australia.

Austline Fabrications was engaged by Lion Nathan to complete the following scope of works;

Remove 4 fermenting vessels used for beer production in Canning Vale

Refurbish and modify the vessels to suit cider fermentation with modifications made to the cones, nozzles and jackets

Load and transport the vessels to South Australia

Install the tanks at West End Brewery in Adelaide.

Download our Case Study PDF below to read more about this project.

Water Corporation

Stainless Steel Solutions for Water Corporation Projects

Pit Covers

DM CIVIL, ARMADALE PUMP STATION

Austline fabricated and supplied pit covers, safety grates and a stainless steel cast in frame complete with an aluminium cover. All stainless steel items were completely seal welded and passivated as per Water Corporation specifications. Items were inspected by Water Corporation welding inspectors and dispatched with a Water Corporation release form.

Download our Case Study PDF below to read more about this project.

Envar PTY LTD

Curtin University, Bentley Campus Perth

New Technology

Building 304 will provide custom research facilities dedicated to the Centre for Crop and Disease. Situated on the eastern side of Curtin’s Bentley campus; the four-story building will feature three levels of highly specialised laboratories.

Download our Case Study PDF below to read more about this project.